Monday, April 6, 2009

Carpet

Well we have made some progress on both the vineyard and the house. In the vineyard the long process of getting all the structure in is about done. What was going to take about 10 days has taken over a month. Don't get me started. I do not have a picture to show, but the irrigation is hooked up and running, and all that remains is the fence that goes around the whole vineyard. That should be started today.

The house has changed dramatically. The carpet was installed on Thursday. Two guys from Carpet world in Lubbock came Thursday morning at 9:00 am and left Friday morning at 6:00 am. That's right they stayed all night until it was done. I guess they finished at one in the morning and slept a bit before they drove back to Lubbock. Anyway it looks amazing. Val Podea and his brother Chris started the stair railing, and Joe Stalcup finished the stain and lacquer on the cabinets.

So here are a few pictures, one is an up close of the carpet so you can have an idea what it really looks like.

More to come....

p.s. Anyone want to help plant vines on April 25th? We need around 15 people to really make it work fast and effective. Let me know.



Monday, March 23, 2009

Spring Break

Here is how my Spring Break went. A little paint, a little sanding, a little covering of wallpaper, a little plowing in the vineyard.

Here are some pictures with some before and after shots of a few rooms.

Before the kitchen looked like this,


Today it looks like this.



The master bedroom once looked like this...



And now looks like this....

Our orange room which once was covered in this orange velvet wallpaper and looked like this....


Now is a smooth textured room with a slight green paint job and looks like this.....


And here is one picture of how the vineyard is coming along. The people installing the framework for the vineyard are amazing. The posts are so straight it just blows me away. Today the vineyard looks like this....

Friday, March 13, 2009

Cabinets

I know they are bear wood, but here are the kitchen cabinets, made of Red Oak by Joe Salcup from Lubbock Texas. We are going to stain them dark with no pull knobs.

This side of the kitchen will have no appliances, just the small peninsula as an eating area.


This is the other side. You are looking at where the sink will be under the window and to the left the Microwave above the range oven.

This is a good view of the doors with the crown molding on top to create a castle top look.

And that is it for now, lights, paint, carpet, and a staircase are left. Some people say we will be in by Easter.

We shall see....

Wednesday, March 11, 2009

A little Progress

Just a few pics of the progress of the vineyard at Tell. These are all as of 3/10/09. More work to be done this week with fence, wires and drip irrigation.

This is a pic of the water lines for all 16 rows coming out of the ground at the north end of each row. It was rough but this is connected to our new well in that small white house in the background. Thanks Chad Detwiler and WP Drilling out of Quannah, Texas.



This is the view looking south from the driveway that goes to the house. The rows are 500 feet long and have a T-Post every 16 feet. The accuracy of the placement of each post is astounding. Thanks Mendoza Fencing.



The view from the south end of the vineyard looking north at the house.



A close up of the row so you can get an idea of how straight the Mendozas set the posts.


It is all too exciting.

Friday, March 6, 2009

Tile and a Fan

I just wanted to post some pictures of the tile in our new bathrooms and the new ceiling fan we got for a steal at Home Depot in Amarillo. It never ceases to amaze me that small changes can make a huge difference.




On all our upstairs windows there are gaps behind the window casing. These gaps are so big you can see outside so they have now been filled with Good Stuff expandable foam. That stuff rocks. Of course I had to scrape out all the wasp nests that were in there before the foam, but that is the fun part.


I am not a pro, but it looks pretty good for a slacker like me.


We like this fan so much there will be four of them in the house.

Wednesday, March 4, 2009

Update for the Vineyard




Alot will change over the next several weeks. We are turning a 3.52 acre wheat field into a vineyard. Today Chad Detwiler (apologies for the spelling) set the posts for the structure that will hold the vines as they grow. It is very exciting. We have a water well that is functioning, and the fence will go up this weekend. Amazing and scary all at once.

Thursday, February 19, 2009

Couple Things

This is the picture I promised of Zoey's leg. She is doing good. Walking well. In two weeks or so we will start short walks outside.

As for MJ and I we are very excited as today starts the first day for us as business owners. We sign today for the vineyard and begin work to prepare for planting next week with the water well install. So this is scary and exciting, but we have done a lot of planning and things look great from here.

Funny story that not everyone will know, but you will understand if you know me. About two weeks ago MJ and I bought a Sequoia, signed and drove it home. An awesome car, fully loaded with all the toys and I just loved it and so did MJ. We could travel with room and style. By the next day I was feeling the guilt and we called to return it. The dealer ended up taking it back, and that may be the best thing that has happened to me in the last 6 months. I have a sickness with cars, and maybe I am finally over this because MJ and I are now investing rather than spending. It feels great.

I guess I will also include a few pictures of the Tell house. Cabinets are being started, bathrooms are framed and drywalled, and texturing continues. I start tile work this weekend. Here are a few pics. Maybe we will move in in May or June.

The bathroom did look like this

And now it looks like this..



Have a great week.